Water and Sediment Process Variation in Jingjiang River in the Middle Reaches of the Yangtze River and Response Analysis of Flow Capacity of Three Outlets
The Jingjiang reach of the middle reaches of the Yangtze River is connected to Dongting Lake through three outlets,forming an extremely complex and far-reaching relationship between the rivers and lakes.The operation of the Three Gorges Project has changed the natural water and sediment process in t...
Saved in:
Main Authors: | SHEN Jian, YUAN Song |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2024-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.02.007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Water and Sediment Variation Characteristics in Jingjiang River Reach before and after Operation of Three Gorges Reservoir Based on GAM
by: DING Jiawei, et al.
Published: (2025-01-01) -
Analysis of Water and Sediment Variation Characteristics in Jingjiang River Reach before and after Operation of Three Gorges Reservoir Based on GAM
by: DING Jiawei, et al.
Published: (2024-01-01) -
Analysis of Flow and Sediment Diversion at Three Outlets and Changes on FlatBeach Channel Morphology of Jingjiang River under the Condition of Fresh Water and Sediment
by: ZHOU Caijin, et al.
Published: (2020-01-01) -
Study of Bed Deformation Trend of Wakouzi-Majiazui Section in the Upper Jingjiang Reach of Yangtze River
by: ZHANG Hong, et al.
Published: (2021-01-01) -
Numerical Simulation Analysis on Change of Diversion Ratio of North and South Ports in the Lower Reaches of the Minjiang River
by: XIA Houxing
Published: (2023-01-01)