基于flow-3d软件溢流坝不同鼻坎角度的三维数值模拟
Saved in:
Main Author: | 胡海松 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2017-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=48636036&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
非溢流坝施工期温度应力场数值模拟研究
by: 糜凯华, et al.
Published: (2022-01-01) -
基于CATIA软件的混凝土面板堆石坝三维设计研究
by: 万云辉, et al.
Published: (2015-01-01) -
基于GMS软件对昆明北市区地下水系统的数值模拟
by: 韦耀东, et al.
Published: (2012-01-01) -
基于离散单元法的三维滑坡过程数值模拟分析
by: 赵 川, et al.
Published: (2015-01-01) -
基于颗粒流数值模拟的尾矿坝稳定分析
by: 李锋
Published: (2017-01-01)