BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study
Traditional project scheduling tools like Gantt charts struggle with dynamic adjustments and real-time optimization in complex construction projects, leading to inefficiencies and delays. This study addresses this challenge by proposing a dynamic optimization framework that integrates Building Infor...
Saved in:
| Main Authors: | Heap-Yih Chong, Xinyi Yang, Cheng Siew Goh, Yan Luo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-07-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/14/2451 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Four-Dimensional Building Information Modeling (4D BIM) in Construction Project Management
by: Farzad Fani, et al.
Published: (2018-04-01) -
How to improve performance of Chinese BIM-supported civil engineering projects based on the qualitative comparative analysis method
by: Weiwei Zuo, et al.
Published: (2025-07-01) -
BIM for efficiency and sustainability in construction: a case study in Indonesia
by: Yongki Alexander Tanne, et al.
Published: (2025-04-01) -
Trends of BIM integration in construction education: A bibliometric-based visualization analysis
by: Daniel Ebo Hagan, et al.
Published: (2025-04-01) -
Urban Heat Island Mitigation by LEED and BIM Integration—A Review
by: Hafiz Saeed Ur Rehman, et al.
Published: (2025-07-01)