Probe into Construction Management Pattern for Xiangshui Hydropower Project
Saved in:
Main Authors: | 周邦统, 毕仁友 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2002-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672959&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Treatment of Vibration Problem in Hydro-generator Group in Xiangshui Hydropower Station
by: BI Ren-you, et al.
Published: (2009-01-01) -
Probe into Construction and Operation Management of Water Resources Informization Project
by: 廖征红, et al.
Published: (2004-01-01) -
Design and Construction of Extension Project of Baishiyao Hydropower Station
by: SONG Man-yan, et al.
Published: (2005-01-01) -
关于珠江委在审查河道管理范围内建设项目中存在问题的思考
by: 周邦统, et al.
Published: (2011-01-01) -
On the Construction Management of RCC Dam of Shankou Hydropower Station
by: 裴泽华, et al.
Published: (2001-01-01)