BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam
The construction of concrete gravity dams is subject to various factors, of which the rational arrangement of the placing face significantly impacts the total duration. To seek an ideal duration under a variety of limitations, the BIM technology and Shell's sort are jointly applied in the visua...
Saved in:
Main Authors: | XU Xiaofeng, YU Hong, JIANG Kaiyun |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2024-10-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.10.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prediction and Monitoring Model of Concrete Dam Deformation Based on WOA-RFR
by: FENG Yu, et al.
Published: (2024-07-01) -
Research on Slope Angle of Base for Asphalt-Concrete Core Dam
by: FAN Dongyang, et al.
Published: (2023-01-01) -
Monitoring Model of Concrete Dam Deformation Based on Gray Wolf Optimization Algorithm
by: CHEN Shuyun, et al.
Published: (2021-01-01) -
Simulation and Impact Analysis of Flooding Caused by the Break of a Concrete-face Rockfill Dam
by: ZHAN Mingqiang, et al.
Published: (2022-01-01) -
Study of Stress and Deformation of High Concrete-Face Rockfill Dam on Steep Slope in Narrow Valley
by: HOU Bingling, et al.
Published: (2022-01-01)