BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam
The construction of concrete gravity dams is subject to various factors, of which the rational arrangement of the placing face significantly impacts the total duration. To seek an ideal duration under a variety of limitations, the BIM technology and Shell's sort are jointly applied in the visua...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2024-10-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.10.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841530496673120256 |
---|---|
author | XU Xiaofeng YU Hong JIANG Kaiyun |
author_facet | XU Xiaofeng YU Hong JIANG Kaiyun |
author_sort | XU Xiaofeng |
collection | DOAJ |
description | The construction of concrete gravity dams is subject to various factors, of which the rational arrangement of the placing face significantly impacts the total duration. To seek an ideal duration under a variety of limitations, the BIM technology and Shell's sort are jointly applied in the visual simulation of the dam placement plan. A dam BIM model is built and stratified. The stratified dam block sequences are taken as the variable, and the placing intensity, vertical placing interval time, transverse placing interval time, maximum adjacent height difference, and flood control rule as constraints. The Shell's sort is then applied to find the optimal solution of the placing scheme under those constraints, a computer program was developed by the Revit API interface based on .Net framework and C# language. The visual simulation of the concrete-placement optimization sequencing process was achieved. According to the engineering application, the program can quickly obtain the optimal placing sequencing and total duration under different constraints. The finding is of great significance in guiding the mechanical equipment and can be applied to similar projects. |
format | Article |
id | doaj-art-0f4d96fe90e94cff9f8cc10c8b2c68d9 |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2024-10-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-0f4d96fe90e94cff9f8cc10c8b2c68d92025-01-15T03:02:10ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352024-10-014510811356868261BIM-based Optimization of Placing Sequencing of A Concrete Gravity DamXU XiaofengYU HongJIANG KaiyunThe construction of concrete gravity dams is subject to various factors, of which the rational arrangement of the placing face significantly impacts the total duration. To seek an ideal duration under a variety of limitations, the BIM technology and Shell's sort are jointly applied in the visual simulation of the dam placement plan. A dam BIM model is built and stratified. The stratified dam block sequences are taken as the variable, and the placing intensity, vertical placing interval time, transverse placing interval time, maximum adjacent height difference, and flood control rule as constraints. The Shell's sort is then applied to find the optimal solution of the placing scheme under those constraints, a computer program was developed by the Revit API interface based on .Net framework and C# language. The visual simulation of the concrete-placement optimization sequencing process was achieved. According to the engineering application, the program can quickly obtain the optimal placing sequencing and total duration under different constraints. The finding is of great significance in guiding the mechanical equipment and can be applied to similar projects.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.10.011concrete damplacingconcrete-placement optimization sequencingShell's sortvisual simulation |
spellingShingle | XU Xiaofeng YU Hong JIANG Kaiyun BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam Renmin Zhujiang concrete dam placing concrete-placement optimization sequencing Shell's sort visual simulation |
title | BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam |
title_full | BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam |
title_fullStr | BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam |
title_full_unstemmed | BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam |
title_short | BIM-based Optimization of Placing Sequencing of A Concrete Gravity Dam |
title_sort | bim based optimization of placing sequencing of a concrete gravity dam |
topic | concrete dam placing concrete-placement optimization sequencing Shell's sort visual simulation |
url | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.10.011 |
work_keys_str_mv | AT xuxiaofeng bimbasedoptimizationofplacingsequencingofaconcretegravitydam AT yuhong bimbasedoptimizationofplacingsequencingofaconcretegravitydam AT jiangkaiyun bimbasedoptimizationofplacingsequencingofaconcretegravitydam |