Assessment of Multi-attribute Flood Risk in the Pearl River Basin Considering the Reasonable Service Life of the Project
Flood is characterized by flood peak, flood volume and duration. The impact of theproject's reasonable service life was ignored in previous flood risk assessment. And the riskindex considering reasonable service life of the project can better describe the flood riskundertaken by the projects. B...
Saved in:
Main Authors: | WANG Hanye, HUANG Shengzhi, WANG Lu, FANG Wei |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2020-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.05.002 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of Peaks Over Threshold Method in Flood Frequency Analysis in Seyhan Basin
by: Gülay Onuşluel Gül, et al.
Published: (2020-07-01) -
Multivariable Flood Frequency Analysis of the Yujiang River Based on Annual Maximum Method and Peaks Over Threshold Method
by: CHEN Quanfu, et al.
Published: (2024-01-01) -
Possibilities of Using Regional Index-Flood Method with Annual Maximum and Partial Duration Series: A Case Study of Susurluk River Basin, Turkey
by: Havva Eylem Polat, et al.
Published: (2025-01-01) -
Analysis of Floods in Xijiang River and Beijiang River Based on Copula Function
by: REN Chengjun
Published: (2023-01-01) -
Design Flood Calculation Model for Extra-Small Watersheds in Ungauged Basin
by: Yun Wang, et al.
Published: (2025-01-01)