Analysis of Drift Configuration and Underground Power House Excavation Design for a Construction Project
Saved in:
Main Author: | PAN Wei |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2008-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47662929&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and Construction Schedule for Underground Powerhouse Excavation of Shenzhen Pump Storage Plant
by: 潘伟
Published: (2003-01-01) -
Numerical Study of Damage to Rock Surrounding an Underground Coal Roadway Excavation
by: Jiangbo Wei, et al.
Published: (2020-01-01) -
Influence of Underground Tunnel Excavation on Upper-level Existing Pipelines
by: Xingfa Feng, et al.
Published: (2022-01-01) -
Optimization of Construction Schemes for Excavation of Main Tunnel of Draft Tube of Baise Project
by: WANG Yang
Published: (2006-01-01) -
Construction Practice of 50t Prestressed Anchor Bars in the Underground Powerhouse of Xiaolangdi Project
by: 黄红万, et al.
Published: (2004-01-01)