APA (7th ed.) Citation

Wei, P. Analysis of Drift Configuration and Underground Power House Excavation Design for a Construction Project. Editorial Office of Pearl River.

Chicago Style (17th ed.) Citation

Wei, PAN. Analysis of Drift Configuration and Underground Power House Excavation Design for a Construction Project. Editorial Office of Pearl River.

MLA (9th ed.) Citation

Wei, PAN. Analysis of Drift Configuration and Underground Power House Excavation Design for a Construction Project. Editorial Office of Pearl River.

Warning: These citations may not always be 100% accurate.