Engineering Geologic Problems and Treatment Measures for Intake Towers Foundation of Baise Hydropower Station
Saved in:
Main Author: | YU Hua-zhu |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2006-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47666035&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Stress Analysis of Intake Tower s Foundation of Baise Hydro power Station
by: WU Sheng
Published: (2006-01-01) -
Assambly of Spiral Case of Baise Hydropower Station
by: LI Xing-wen
Published: (2006-01-01) -
Probe into the Assambling Welding of Slant Arms of Rotor Disk of Generator of Baise Hydropower Station
by: WANG Chang-fu
Published: (2006-01-01) -
Summary of Experience in Geological Investigation of Nepal Hydropower Station
by: DING Bin, et al.
Published: (2021-01-01) -
Investigation of Special Engineering Geologic Problems of the Secondary Dam Foundation of Shuicheng Reservoir
by: ZHENG Dong-yan
Published: (2005-01-01)