Analysis of Method for Determining High Culvert Flow in Chahe Reservoir in Yimen County
Saved in:
Main Author: | Zhu Wen-xiang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2012-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47656771&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and Construction of Culvert Redevelopment with Conduit Jacking for Niangkeng Reservoir
by: 邱森才
Published: (2001-01-01) -
Design of Shuimogou Siphon Culvert Project
by: 陈晓东, et al.
Published: (2001-01-01) -
Correction: Physical modeling of the effect of shape, blockage, and flow variability on scour in culvert outlets.
by: Kaywan Othman Ahmed, et al.
Published: (2024-01-01) -
Hydraulic Experimental Research on Taiyuan Antisiphonage Culvert
by: 陈灿辉, et al.
Published: (2004-01-01) -
Repair of Corroded Concrete of Sea Dyke's Relief Culvert by SPC Mortar
by: ZHANG Wen-yuan
Published: (2000-01-01)